# | Name | Location | Type | Details | Index | Description |
---|---|---|---|---|---|---|
.01 | history reference | 0;1 | FREE TEXT | Reflects date on which Work Order was posted to EQUIPMENT INV. file, and type of work performed. | ||
1 | w.o. reference | 0;2 | FREE TEXT | The number of the Engineering work order that resulted in this posting. | ||
2 | pm status | 0;3 | SET OF CODES | P:PASS C:CORRECTIVE ACTION TAKEN/REQUESTED D0:DEFERRED D1:DEFERRED, COULD NOT LOCATE D2:DEFERRED, IN USE D3:DEFERRED, OUT OF SERVICE OR LOANED OUT | If this posting is the result of a preventive maintenance (PM) inspection, this field should be used to indicate the outcome of that PM. Field should be left blank in cases of regular (unscheduled) work action. | |
3 | hours spent | 0;4 | NUMERIC | Total hours spent in completion of subject work order. Calculated by a routine that runs automatically when work orders are closed out. | ||
4 | labor $ | 0;5 | NUMERIC | Labor cost associated with subject work order. Calculated on the basis of wage information from the Engineering Employee File by a routine that runs automatically when work orders are closed out. | ||
5 | material $ | 0;6 | NUMERIC | Cost of materials used in performing this work action. Data is manually entered into the Work Order File and automatically extracted from the work order into the Equipment History when the work order is closed out. | ||
6 | vendor $ | 0;7 | NUMERIC | Amount paid to vendor on account of subject work action. Entered manually (if applicable) when work orders are closed out. | ||
7 | worker | 0;8 | FREE TEXT | First 15 characters of the name of the PRIMARY TECHNICIAN as it appears in the Engineering Employee File. | ||
8 | total cost | COMPUTED | Total cost of work action being posted. Computed field. | |||
9 | work performed | 0;9 | FREE TEXT | Brief description of what was done via subject work action. Automatically extracted from the Work Order File. |
Error: Invalid Global File Type: 6914.02