Files > EQUIPMENT HISTORY

parent
6914
name
EQUIPMENT HISTORY
number
6914.02
Fields
#NameLocationTypeDetailsIndexDescription
.01history reference0;1FREE TEXTReflects date on which Work Order was posted to EQUIPMENT INV. file, and type of work performed.
1w.o. reference0;2FREE TEXTThe number of the Engineering work order that resulted in this posting.
2pm status0;3SET OF CODESP:PASS
C:CORRECTIVE ACTION TAKEN/REQUESTED
D0:DEFERRED
D1:DEFERRED, COULD NOT LOCATE
D2:DEFERRED, IN USE
D3:DEFERRED, OUT OF SERVICE OR LOANED OUT
If this posting is the result of a preventive maintenance (PM) inspection, this field should be used to indicate the outcome of that PM. Field should be left blank in cases of regular (unscheduled) work action.
3hours spent0;4NUMERICTotal hours spent in completion of subject work order. Calculated by a routine that runs automatically when work orders are closed out.
4labor $0;5NUMERICLabor cost associated with subject work order. Calculated on the basis of wage information from the Engineering Employee File by a routine that runs automatically when work orders are closed out.
5material $0;6NUMERICCost of materials used in performing this work action. Data is manually entered into the Work Order File and automatically extracted from the work order into the Equipment History when the work order is closed out.
6vendor $0;7NUMERICAmount paid to vendor on account of subject work action. Entered manually (if applicable) when work orders are closed out.
7worker0;8FREE TEXTFirst 15 characters of the name of the PRIMARY TECHNICIAN as it appears in the Engineering Employee File.
8total costCOMPUTEDTotal cost of work action being posted. Computed field.
9work performed0;9FREE TEXTBrief description of what was done via subject work action. Automatically extracted from the Work Order File.

Error: Invalid Global File Type: 6914.02