Files > PM PROCEDURES

name
PM PROCEDURES
number
6914.2
location
^ENG(6914.2,
description
File of formal procedures used at the host site in the performance of scheduled maintenance (PMI). If a facility wants their source documents in electronic format and is willing to accept the limitations of the FileMan word-processing editor, then the actual step by step text of a PM Procedure may be stored in this file.
Fields
#NameLocationTypeDetailsIndexDescription
.01pm reference(+)0;1FREE TEXTBThis reference identifies the PM procedure and is similar in concept to a memo number (e.g. EL-1). It will be shown on PM worklists along with the PM title.
1procedure title0;2FREE TEXTCThis is the title of the PM procedure. It will be shown on PM worklists and also in the Work Performed field of PM work orders.
2source0;3FREE TEXTSource of the PM instructions. Could be the equipment manufacturer or some authoritative and/or knowledgeable organization (ex: ASHE, VACO, NEMA, etc). Use of this field is optional.
3text1;0WORD-PROCESSINGEnter the actual PM instructions here. Sites that are short on disk space should generally maintain the actual procedures in hard copy only.

Not Referenced