Files > FREQUENCY

parent
6911.01
name
FREQUENCY
number
6911.13
Fields
#NameLocationTypeDetailsIndexDescription
.01frequency0;1SET OF CODESA:ANNUAL
S:SEMI-ANNUAL
Q:QUARTERLY
M:MONTHLY
BM:BI-MONTHLY
W:WEEKLY
BW:BI-WEEKLY
N:NONE
BA:BI-ANNUAL
TA:TRI-ANNUAL
Make a separate entry for each category (MONTHLY, QUARTERLY, etc.) of PMI that is to be scheduled for this device. The PM module looks at this field in conjunction with the STARTING MONTH when PM lists are generated. Let's consider a fairly complex example: a device with SEMI-ANNUAL, QUARTERLY, and MONTHLY PMI's and a STARTING MONTH of MAR. Assuming no entry for SKIP MONTHS, the following PMI's will be scheduled: SEMI-ANNUAL in MAR and SEP; QUARTERLY in JUN and DEC; MONTHLY in APR, MAY, JUL, AUG, OCT, NOV, JAN, and FEB.
1hours (estimated)0;2NUMERIC Approximate amount of time required for this PMI (standard hours), to the nearest tenth of an hour. This value will be recorded in the EQUIPMENT HISTORY field when a PM is closed out unless another (more precise) value is explicitly entered.
2material cost (estimated)0;3NUMERIC Estimated material cost for this PMI (standard cost). This cost will be charged to the piece of equipment whenever a PMI of this type is closed out unless another (more precise) value is entered at close-out time.
3level0;4FREE TEXT Each scheduled PMI may be composed of some combination of the following discrete levels of activity: Level 1 - Visual inspection only; Level 2 - Check and adjust operator controls; Level 3 - Electrical safety analysis; Level 4 - Minor parts replacement; Level 5 - Major parts replacement; Level 6 - Complete overhaul. LEVEL is an optional field, and is intended to accommodate the needs of certain facilities with highly developed PM programs. Entries for LEVEL (if any) will appear on the PM worklist as a reminder to the responsible technician.
4procedure0;5POINTER6914.2 Enter the abbreviation (4 to 10 characters) of the PROCEDURE to be followed when performing this Preventive Maintenance Inspection. The full title (as well as the abbreviation) of the PM PROCEDURE will appear on the computer generated worklist for reference. If disk space permits, the actual step-by-step procedure may be entered in the TEXT field of the PM PROCEDURES file (Number 6914.2) and printed out on demand. In any event, the PMI procedure should be on file in some form and readily accessible to the technician performing the work.
5starting year (4 numerics)0;6NUMERICThis field has meaning only for BI-ANNUAL and TRI-ANNUAL frequencies. Year must be entered as four numeric characters (ex: 1998, 2002, etc.).

Error: Invalid Global File Type: 6911.13